Case Study 1

Automation for Injectable Manufacturing Line

REQUIREMENT

Automation of preparation tanks, Manufacturing Tanks with integrated CIP system. Automation must Cover –

  • Redundancy to assure operational reliability
  • Control, monitoring and alerting of critical process parameters
  • 21CFR Part 11 Complaint System

AUTOMATION SOLUTION PROVIDED

  • S7400 – Redundant CPU 412-3H with Redundancy Bundle for automation of the tanks and CIP skids
  • MP377 15” Multi Panel – 1 Nos for local operation of the fixed tanks.
  • Hardware Y Link (To communicate third party devices with redundant controllers)
  • MM420 VFD – 8Nos for mixing and transfer activities.
  • Central SCADA with WinCC V7.0 RT 512 Tags and Audit License for Compliance.